Caisson Construction Problems and Correction in Chicago
Originally published in Journal of the Soil Mechanics and Foundations Division, Vol. 97, No. 2, February 1971, pp. 417-440...

Offshore Technology in Civil Engineering
Hall of Fame Papers from the Early Years: Volume Five
Prepared by the Program Committee, Offshore Technology Conference, of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This series presents...

Minimum Design Loads for Buildings and Other Structures
Minimum Design Loads for Buildings and Other Structures provides requirements for general structural design and includes means for determining...

Field Quality Control
A good quality control program helps ensure that technical requirements of the grouting are met and also adds to the overall success of a grouting project. The quality control program...

Slope Effect on House Shrink-Swell Movements
(Originally published in Journal of the Geotechnical Engineering Division, 1980, 106(12), 1327-1344.)...

ASCE Official Register 2008
The OFFICIAL REGISTER is published annually to provide ready access to governing documents, statistics, and general information about ASCE for leadership, members, and staff. It includes...

Floodplain Delineation of the Ranillas Meander in Zaragoza Using GUAD-2D
After the selection of Zaragoza (Spain) as the host city of the International Expo 2008, the Gobierno de Arag?n (i.e., the local government)...

Toward a Unified Approach to Anchorage in Reinforced Concrete Design
The introduction of rationalized design procedures for cast-in and post-installed anchors inEurope and the U.S. was intended to provide a uniform factor of safety for anchorages inconcrete,...

Pioneer Square Areaways
Pioneer Square, one of the earliest neighborhoods in Seattle, is adjacent to Elliott Bay. Much ofthis part of the city originally was built on existing land that used to get flooded. When...

An Experimental Study on the Behaviour of Full-Scale Composite Steel Frames under Furnace Loading
In view of recent large fires in tall buildings, such as One Meridian Square (USA), East Tower Central Park (Venezuela), World Trade Center (USA) and Windsor Tower (Spain), there has been...

Structures Congress 2008
Crossing Borders
The 40th Structures Congress's technical program consists of 10 tracks and three poster sessions. The program covers practical design in the following topic areas including...

Offshore Technology in Civil Engineering
Hall of Fame Papers from the Early Years: Volume Three
Prepared by the Subcommittee on Offshore Technology Conference Support of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This series presents...

Building Code Requirements and Specification for Masonry Structures
Containing Building Code Requirements for Masonry Structures (TMS 402-08/ACI 530-08/ASCE 5-08, Specification for Masonry Structures (TMS 602-08/ACI 530.1-08/ASCE 6-08) and Companion Committees
The Code covers the design and construction of masonry structrures while the Specification is concerned with the minimum construction requirements for masonry in structures. Some of the...

Design-Build Contract Complexities
There are many approaches or options that an owner may pursue in acquiring facilities. Depending on the owner's objectives, the DB project approach may offer unique benefits,...

General Terms and Conditions
DB commercial contract terms can differ from conventional design-bid-build project terms, depending primarily on the owner's objectives, the level of risk that is to be assigned...

Specifications for Design-Build Projects
This chapter discusses the various specifications that come with a design-build project, including owner-generated specifications and contractor-generated specifications....

Structures Congress 2007
The Congress' technical program was designed with the practicing structural engineer in mind while maintaining a rigorous standard for the academic presentations. Topics include:...

Post and Pad
As the name implies, this type of foundation consists of a concrete or wood pad placed on or buried in the ground. It is the lowest priced option for buildings on frozen silt, which may...

Design-Build Procurement
This section addresses suggested means for reaching agreement between owner and DB team on the definition of expected geotechnical conditions....

Roles and Responsibilities
This section summarizes the roles and responsibilities of the parties involved: owner, design team, contractor, construction manager, and dispute adjudicators....

 

 

 

 

Return to search